How do simply estimate the focus factor of a project in Jira Atlassian last year?

I think you are familiar with the book Henrik Kniberg "Scrum and XP from the Trenches" where the formula in the cover image (and others) was taken. So, despite the difficulties of 2022, we continued to work on developing our pet project.


According to official data, the number of working days in 2022 was 257. This is the data for the denominator in the formula - available man-days.


Use the Timesheet Tracking for Jira to know еру data for the numerator in the formula - actual velocity. Actual velocity is the sum of the initial estimates of all stories completed in the last sprint.


I took the data for the last 2022 year, which equals 697 hours or 87.125 days.


Focus factor = 87.125 / 257 = 0.339 or 33.9% last 2022.


What does this number mean? Do you think this is good or bad? How to apply it?


The focus factor is an estimate of how focused the team is. A low focus factor may mean that the team expects many disturbances or expects their time estimates to be optimistic.


The pet project took 33.9% of the time, meaning 8 * 0.339 = 2.71 hours of extra work every weekday or on weekends in the demanding conditions of 2022.


The example in the book shows a focus factor value of 40% for a dedicated project, so 33.9% for the pet project is an excellent value. Though, the default focus factor Henrik Kniberg uses for new teams is usually 70% since that is where most of our other teams have ended up over time.


I can use the value of the focus factor to calculate the estimated velocity.



Thus, if in 2023 we have 250 working days and a backlog with tasks estimated at 1000 hours (125 days) and the situation does not improve, then:

1) in 2023, we predict completing only 84.75 days (678 hours),

2) the remaining 40.25 days (322 hours) we predict to complete in 2024.


Look at the focus factor and actual velocity from the last sprint or any period. Next, look at your total resource availability this sprint or any period and estimate a focus factor. Discuss any differences between these two focus factors and make adjustments as necessary.


2023.05.03
Valerii Kesenko
Tag-iya sa Produkto Saas Petsa Project Sdtest®

Ang Valerii kwalipikado isip usa ka sosyal nga pedagogue-psychologist kaniadtong 1993 ug sukad gigamit ang iyang kahibalo sa pagdumala sa proyekto.
Nakuha ni Valerii ang degree sa usa ka master ug ang proyekto sa proyekto ug programa sa Program sa 2013. Sa panahon sa programa sa iyang agalon, nahibal-an niya ang proyekto sa proyekto nga gesellschaft E. Viral Dinnamics.
Gikuha ni Valerii ang lainlaing mga pagsulay sa dinamika sa Spiral ug gigamit ang iyang kahibalo ug kasinatian aron mapahiangay ang karon nga bersyon sa SdTest.
Ang Valerii mao ang tagsulat sa pagsuhid sa kawalay kasiguruhan sa V.U.C.A. Konsepto gamit ang mga dinamikong Spiral ug mga istatistika sa matematika sa Psychology, labaw sa 20 nga internasyonal nga botohan.
Kini nga post adunay 0 Mga Komento
Tubag sa
Kanselahon ang usa ka tubag
Biyai ang Imong Komento
×
IMONG MAKITA usa ka sayup
Tanyag, pahayag sa inyong HUSTO VERSION
Pagsulod sa imong e-mail sama sa gitinguha
Send
Cancel
Bot
sdtest
1
Kumusta didto! Pangutan-on ko ikaw, nakasinati ka na ba sa dinamikong spiral?